Excellence in Flooring since 1959

Manitou Springs High School

Manitou Springs High School

In 2018, Manitou Springs High School’s gym floor failed due to exterior and concrete moisture infiltration.  El Paso Floor removed the old floor, applied a epoxy moisture mitigation system and installed a new Connor Sports Focus system.  The graphics include a 40 foot tall Mustang!