Sampson Construction built a beautiful brand-new high school in Severance, CO in 2019. El Paso Floor installed the main gym and auxiliary gyms with Connor Sports Alliance and a cheer room with NeoShok.
Sampson Construction built a beautiful brand-new high school in Severance, CO in 2019. El Paso Floor installed the main gym and auxiliary gyms with Connor Sports Alliance and a cheer room with NeoShok.
Monday – Thursday
8:30am – 5:00pm
Friday
8:30am – 4:00pm
1850 Hancock Drive
Colorado Springs, CO 80903
1 mile south of the intersection of Fountain/Hancock on Hancock