Sports Flooring

Doherty High School
In 2018, Doherty High School in Colorado Springs had a catastrophic flood that destroyed the wood gym floor and infiltrated a mercury-laden floor beneath.  After extensive mitigation was done, the result was one of the nicest high school gymnasiums in Colorado.  Almost 18,000 square feet of Connor Sports Rezill Base subfloor and 1st grade maple was installed, and modern graphics and design were added.  New bleachers, paint, climbing wall, banners and sound system make this gymnasium a real jewel in Colorado Springs.
Mesa Ridge High School was in desperate need of a new floor.  Their old floor had broken boards and safety concerns.  El Paso Floor removed that old floor and installed a new Anchored Rezill Sleeper system from Connor Sports and beautiful modern graphics.
Mesa Ridge High School
Hanover School
Hanover School had a synthetic urethane gym floor in desperate need of repair and resurface.  El Paso installed a new pad & poured synthetic floor over the existing surface that Hornet Nation can be proud of.
Sterling High School had a terrific large gymnasium, but a less than terrific aging synthetic floor.  El Paso Floor installed a new Connor Sports Rezill Base Reduced Profile floor directly over the old synthetic floor.  This gymnasium is now complete!
Sterling High School

CONTACT US

This field is for validation purposes and should be left unchanged.